Drop structure waterway block
By converting on-site drop-off work to precast, significant reductions in construction time and improvements in productivity can be achieved.
■ By utilizing precast technology, we achieve significant reductions in construction time and improvements in productivity. ■ The use of hardware connections accelerates construction and reduces labor on-site. ■ It can accommodate drop heights of 500 to 1000 mm. ■ It is compatible with drainage flumes ranging from HF300 to HF900. ■ The standard extension for the waterway section is 4 meters for drainage flumes below HF500 and 6 meters for those above HF600. ■ By adjusting the extension and using a stepped drop, it can accommodate longitudinal slopes and effectively reduce flow velocity. *We can also consider specifications other than those listed. Please consult us.*
- Company:昭和コンクリート工業
- Price:Other